Home


Our Mission:
Through a partnership with our members,
we will provide the safest and most reliable
service, for the lowest possible price.

Rates

Semo Electric Cooperative

Rate Summary 03/01/08

Certain terms and conditions apply to each rate. To get a complete listing of terms and conditions, stop by one of our two locations or call 1-800-813-5230.

Rate
Title
Avail Charge
KWH
KW
Notes
01 Residential
16.00
.083    
05 General Service 1 Phase
25.00
.09    
12 Small 3 Phase Ag Service up to 50 KW
31.00
.09    
14 Large 1 and 3 Phase Agriculture Service more than 50 KW
31.00
.0575 9.00 no ratchet  
20 Small Public Buildings 1 Phase
25.00
.09    
21 Small Public Buildings 3 Phase
31.00
.09    
22 Large Public Buildings
31.00
.0575 9.00 no ratchet  
23 1 Phase Church
25.00
.0875    
24 3 Phase Church
31.00
.0875    
31 Small Commercial less than 50 KW
31.00
.090    
32 Large Commercial 50 KW or More
31.00
.06 9.00 no ratchet  
52

Security/Street Lighting

150 watt HPS Light

*175 Watt Mercury Vapor

*400 Watt Mercury Vapor

400 Watt Metal Halide

250 Watt HPS Cobra

150 Watt Decorative Street Light

 

8.00

8.00

19.00

19.00

19.00

14.00

    *We no longer offer mercury vapor lights. Any new lights that are installed, will be the HPS (High Pressure Sodium)Cobra.
53 Surge Protection "Homeshield"
6.95 per month
     
61

Industrial over 250 KW,

KWH above 100 per KW

75.00

.058

.055

9.00 100% ratchet  
64 Industrial - Load Controlled over 250 KW
75.00

.065

.062

10.00 no ratchet  
71 Irrigation
30.00
.0665 12.00 no ratchet  
72 Irrigation - Controlled
30.00
.086   1-7 p.m. June, July & August
81 Super Industrial 2000 KW and Up
100.00 per month

.054

.046

8.00 100% ratchet